Recent Submissions

  • Thumbnail

    Labor Productivity Rating in Construction Project in Luangprabang Lao PDR 

    Collection: Theses (Master's degree) - Construction Project Management / วิทยานิพนธ์ - การจัดการโครงการก่อสร้าง
    Type: Independent Study
    Houmvilith Mingboubpha (Silpakorn University, 29/11/2019)
    This study aims to determine the Labor Utilization Factor (LUF) and the labor productivity in a construction case study of a police office project in Louangprabang, Lao PDR. Five activities: steel formwork installation for ...
  • Thumbnail

    Study of  interior contractor procurement methods for interior decoration of retail stores in shopping center 

    Collection: Theses (Master's degree) - Construction Project Management / วิทยานิพนธ์ - การจัดการโครงการก่อสร้าง
    Type: Independent Study
    ปรารถนา ทรงวาจา (Silpakorn University, 29/11/2019)
    The purposes of this study were to compare interior contractor procurement methods for interior decoration of retail stores in shopping centers in terms of operating procedures, criteria for selection of contractor procurement ...
  • Thumbnail

    A comparative study of a Maintenance bond with the actual repair cost of renovation public buildings 

    Collection: Theses (Master's degree) - Construction Project Management / วิทยานิพนธ์ - การจัดการโครงการก่อสร้าง
    Type: Independent Study
    รินรดี อารีราษฎร์ (Silpakorn University, 29/11/2019)
    The objectives of this research were 1) to study the difference between the cost of the maintenance bond and the actual cost for repairing defects within the two year warranty period. 2) to investigate the repair frequency ...
  • Thumbnail

    The Verdict of the Supreme Court Related to Construction Contracts  

    Collection: Theses (Master's degree) - Construction Project Management / วิทยานิพนธ์ - การจัดการโครงการก่อสร้าง
    Type: Independent Study
    ดารารัตน์ ศรีสุวรรณ์ (Silpakorn University, 29/11/2019)
    Construction is a complex work, both work procedures and working methods, consisting of multiple parties. However, if the employer or contractor breaches the contract, causing the dispute to result in a lawsuit. Since all ...
  • Thumbnail

    Factors affecting heritage building conservation projects management with different usage characteristics : 3 case studies 

    Collection: Theses (Master's degree) - Construction Project Management / วิทยานิพนธ์ - การจัดการโครงการก่อสร้าง
    Type: Independent Study
    ศิริชัย พงษ์สุชาติ (Silpakorn University, 12/7/2019)
    The objective of this research is to investigate the factors that affect the heritage building conservation project management in three different building types, namely hotel, office building, and commercial building. The ...

View more

 

Copyright  ©  2021 Silpakorn University Central Library All Rights Reserved.
Theme by 
Atmire NV